Significant progress made in the construction of Shenyang-Baishan High-speed Railway: Tunnels in Liaoning section all break through, Baishan East Station completes main structure capping
Significant progress made in the construction of Shenyang-Baishan High-speed Railway: Tunnels in Liaoning section all break through, Baishan East Station completes main structure cappingOn May 27th, according to "China Railway", the Shuncheng Tunnel designed by China Railway Design Corporation for the Shenyang-Changbaishan High-speed Railway (hereinafter referred to as "Shenbai High-speed Railway") was recently completed, marking the completion of all tunnels in the Liaoning section of the Shenbai High-speed Railway. With a total length of approximately 430 kilometers and a designed speed of 350 kilometers per hour, the Shenbai High-speed Railway is an important part of the Northeast Eastern Fast Railway Corridor in the national "Medium and Long-Term Railway Network Plan...
Tech >>
A Case of Monkeypox Discovered in Shenyang City, Liaoning Province
On June 29, a suspected case of Monkeypox virus infection was reported in Shenyang, Liaoning Province. The case was tested by the laboratories of the Centers for Disease Control and Prevention in Liaoning Province and Shenyang City and rechecked by the China Center for Disease Control and Prevention...
Tech >>